Arditi, D and Chotibhongs, R (2009) Detection and prevention of unbalanced bids. Construction Management and Economics, 27(08), 721–32.

Choi, K, Lee, E-B, Ibbs, C W and Kim, Y W (2009) Multifaceted public outreach and cost–benefit analysis for its effectiveness validation. Construction Management and Economics, 27(08), 771–82.

Hyari, K H, El-Rayes, K and El-Mashaleh, M (2009) Automated trade-off between time and cost in planning repetitive construction projects. Construction Management and Economics, 27(08), 749–61.

  • Type: Journal Article
  • Keywords: repetitive construction; scheduling; genetic algorithms; optimization; resource utilization
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446190903117793
  • Abstract:
    An automated model is developed to support the optimization of the planning and scheduling of repetitive construction projects. The model provides the capability of optimizing two important objectives commonly sought in scheduling repetitive construction projects: minimizing project duration; and minimizing project cost. The model performs this multi-objective optimization using a genetic algorithm approach. The output of the model is a set of optimal solutions that represent the trade-off between time and cost in planning repetitive construction projects. Furthermore, the model can be utilized to find a single scheduling solution that provides the minimum overall project cost by simply adding project indirect cost to the obtained project direct cost for each of the obtained scheduling solutions on the Pareto optimal curve. Other important time-related costs are also considered in the model including: early completion incentives, late completion penalties and lane rental costs. Providing the planners of repetitive construction projects with an automated set of optimal time–cost trade-off solutions should contribute to cost-effective and speedy delivery of this type of construction project. An application example is analysed to illustrate the use of the model and demonstrate its capabilities in generating optimal trade-off solutions between minimizing the project time and cost for repetitive construction projects.

Ilozor, B D (2009) Differential management of waste by construction sectors: a case study in Michigan, USA. Construction Management and Economics, 27(08), 763–70.

Javernick-Will, A N (2009) Organizational learning during internationalization: acquiring local institutional knowledge. Construction Management and Economics, 27(08), 783–97.

Voordijk, H (2009) Construction management and economics: the epistemology of a multidisciplinary design science. Construction Management and Economics, 27(08), 713–20.

Yu, W-d, Chang, P-l, Yao, S-H and Liu, S-J (2009) KVAM: model for measuring knowledge management performance of engineering community of practice. Construction Management and Economics, 27(08), 733–47.